Categories

[foru_tag_header] [foru_tag_summary]

nano crystallized glass countertops

[foru_tag_highlights] [foru_tag_performance] [foru_tag_description]

Stone Production Process

1. Select Raw Stone Blocks

1. Select Raw Stone Blocks

Each block is carefully selected from premium quarries for consistent color, density, and structure.

2. Wet Stone Blocks

2. Wet Stone Blocks

Blocks are wetted to reveal their natural texture and reduce dust before cutting.

3. Wash Stone Raw Blocks

3. Wash Stone Raw Blocks

High-pressure washing removes impurities to prepare clean cutting surfaces.

4. Transport to Factory

4. Transport to Factory

Blocks are safely transported with protective measures to prevent damage.

5. Gangsaw Processing

5. Gangsaw Processing

Diamond-blade gangsaws slice blocks into slabs with controlled thickness.

6. Semi Stone Large Slabs

6. Semi Stone Large Slabs

Semi-finished slabs are sorted by tone and structure for consistency.

7. Separate and Dry

7. Separate and Dry

Slabs are naturally air-dried under stable humidity conditions.

8. Brush Stone Glue

8. Brush Stone Glue

Resin is applied to fill micro cracks and enhance slab integrity.

9. Dry Before Polishing

9. Dry Before Polishing

Slabs are preheated to ensure adhesive curing before polishing.

10. Polishing Steps

10. Polishing Steps

Automated polishing lines create mirror finish with consistent gloss.

11. CNC Cutting

11. CNC Cutting

CNC machines cut slabs into precise project sizes.

12. Cut-to-Size Tiles

12. Cut-to-Size Tiles

Tiles are trimmed and edge-finished for installation accuracy.

13. Tiles Draining

13. Tiles Draining

Water is removed from the stone pores to prevent future cracking.

14. Vein Matching Layout

14. Vein Matching Layout

Slabs are laid out to ensure continuous vein alignment.

15. Final Layout Steps

15. Final Layout Steps

Final inspection and layout verification before export.

[foru_tag_applications]

Quality Control Process

Dimension Check
Dimension Check

Each tile’s length and width are measured for precision within ±0.5 mm.

Width & Thickness Check
Width & Thickness Check

Thickness tolerance and edge flatness are verified before packing.

Surface Inspection
Surface Inspection

Inspectors check surface polish, gloss, and defect-free finishing.

Dry-Lay Verification
Dry-Lay Verification

Slabs are laid on-site to confirm vein and tone consistency.

Vein Matching
Vein Matching

Layout is checked for continuous pattern flow and harmony.

Final Layout Confirmation
Final Layout Confirmation

Full project layout verification prior to packaging.

Wooden Crate Installation
Wooden Crate Installation

Crates are assembled with reinforced corners and waterproof lining.

Stone Packaging
Stone Packaging

Foam sheets and spacers ensure secure placement inside crates.

Crate Loading
Crate Loading

Forklifts handle crates carefully to prevent vibration damage.

Final Transportation
Final Transportation

Final check for crate sealing, labeling, and secure lashing during transport.

[foru_tag_projectshow] [foru_tag_expertinsight] [foru_tag_faq] [foru_tag_cta] [foru_tag_ai_visibility] [foru_tag_contactbar]
Get a quote now

We welcome your inquiries and will reply within 24 hours. Please check your email inbox for messages from “[email protected]“!